| Project Name | Type | Client | Location | Value |
|---|---|---|---|---|
| TOLL ROAD DEVELOPMENT OF CILEUNYI-SUMEDANG-DAWUAN PHASE Ⅲ Scope of work(s): Rock Excavation as waste with slope treatment,disposal,compaction of spoil ground,level off the spoil ground |
Construction | China Road and Bridge Corporation & PT. Adhi Karya (Persero) Tbk Joint Operation | Bandung city, West Java Province ,Indonesia | IDR 3.635.000.000 |
| TOLL ROAD DEVELOPMENT OF CILEUNYI-SUMEDANG-DAWUAN PHASE Scope of work(s): Earthwork excavation with slope treatment,disposal,compaction of spoil ground and backfill |
Construction | China Road and Bridge Corporation & PT. Adhi Karya (Persero) Tbk Joint Operation | Bandung city, West Java Province ,Indonesia | IDR 3.200.000.000 |
| Project Name | Type | Client | Location | Value |
|---|---|---|---|---|
| 1. OKI PULP AND PAPER MILL SEAPORT FACILITIES PROJECT Scope of work(s): Installing fire portection system for seaport facilities |
Construction | PT. China Harbour Indonesia | Ogan Komering Ilir Regency, South Sumatera | IDR 26.170.212.766,00 |
| 2. SUMSEL-8 2X660MW MINE-MOUTH COAL FIRED POWER PLANT Scope of work(s): Constructing temporary living area and production area building |
Construction | PT. Zhejiang Tenaga Pembangunan Indonesia | Muara Enim Regency, South Sumatera | IDR 3.892.980.000,00 |
| 3. JAKARTA OFFICE BUILDING RENOVATION Scope of work(s):Jakarta office building renovation. This project consisted of 2 content, design content and construction & procurement content |
Construction | China Huadian Hongkong Company Limited | Jakarta | IDR 3.892.980.000,00 |
| 4. SUMSEL-8 2X660MW MINE-MOUTH COAL FIRED POWER PLANT Scope of work(s):This project consisted of commission purchase, low voltage electric generator installation, electric generator installation for construction works, 800 meters long Indonesian style panel wall construction, and other works (such as: Supermarket near residential area). |
Construction | China Huadian Hongkong Company Limited | Muara Enim Regency, South Sumatera | IDR 16.540.440.000,00 |
| 5. ALUMINA REFINERY CONSTRUCTION PROJECT KETAPANG YEAR 2019 Scope of work(s): This project consisted of dust collector (with corresponding pipeline and electrical) project; Dust collector project (This project is to increase the foundation of 6 alumina silo dust collectors at the wharf, which are located at 40m of 2 # and 3 # silos and 12m away from the bucket); Spare belt conveyor, reinforced steel beam and electrical construction; PE (Polyethylene) pipes reconstruction;Helipad and related roads construction. |
Construction | PT. Well Harvest Winning Alumina Refinery | Mekar Utama Village,Ketapang Regency, West Kalimantan | IDR 8.220.091.784,00 |
| 6. SULBAGUT -1 2X50MW MINE-MOUTH COAL FIRED POWER PLANT Scope of work(s): The project consisted of whole plant retaining wall, plant slope protection, drainage ditch (cutting ditch), road works. |
Construction | PT. Sinoma Engineering Indonesia | North Gorontalo, Sulawesi | IDR 8.792.430.196,00 |
| 7. INDONESIAN BAYAH 10.000 TPD CLICKER CEMENT PRODUCTION LINE II PROJECT | Labor Supply | PT. Sinoma Engineering Indonesia | Bayah, Lebak, Banten | |
| 8. PHASE 2 OF THE MARINE JETTY ENGINEERING OF PT WELL HARVEST WINNING ALUMINA REFINERY | Labor Supply | PT. China Harbour Indonesia | Ketapang, West Kalimantan |
| Project Name | Type | Client | Location |
|---|---|---|---|
| 1.MARINE JETTY ENGINEERING PROJECT KETAPANG | Construction | PT. China Harbour Indonesia | Ketapang Regency, West Kalimantan |
| 2. JINCHUAN, WP & RKA LATERITENICKEL | Construction | PT. Wanatiara Persada | Maluku |
| 3. SIMPLE COFFERDAM WHARF PROJECT OF INDONESIA-CHINA INTEGRATED INDUSTRIAL PARK (JINCHUAN PARK) PHASE I | Construction | PT. China Harbour Indonesia | Ketapang Regency, West Kalimantan |
| 4. ALUMINA REFINERY CONSTRUCTION PROJECT KETAPANG YEAR 2018 construction works, 800 meters long Indonesian style panel wall construction, and other works (such as: Supermarket near residential area). |
Construction | PT. Well Harvest Winning Alumina Refinery | Mekar Utama Village, Ketapang Regency, West Kalimantan |
| 5. BENGKULU 2*100MW COAL-FRED STEAM POWER PLANT PROJECT Scope of work(s): Constructing auxiliary workshop outside the main plant |
Construction | SINOHYDRO | Bengkulu, South West Sumatera |
| 6. PLTMG JAYAPURA, PAPUA PROJECT | Labor Supply | KSO Bagus Karya Aecom Cogindo | Jayapura Regency, Papua |
| 7. PLTMG BAUBAU, SULAWESI TENGGARA PROJECT | Labor Supply | KSO Bagus Karya Aecom Cogindo | Baubau, Southwest Sulawesi |
| 8. PLTMG AMBON, MALUKU PROJECT | Labor Supply | KSO Bagus Karya Aecom Cogindo | Ambon, Maluku |
| 9. INSTALLATION PROJECT (B LOTTERY) BENGKULU (2X100MW) COAL-FIRED POWER GENERATION PROJECT IN INDONESIA | Labor Supply | PT. Nantong | Bengkulu, Sumatera |
| 10. MARINE JETTY ENGINEERING PROJECT KETAPANG | Labor Supply | PT. China Harbour Indonesia | Ketapang Regency, West Kalimantan |
| 11. PROYEK PEMBANGUNAN PABRIK TIMAH BANGKA BELITUNG | Labor Supply | BUT Sinoma (Tianjin) Construction Co., Ltd | Bangka Belitung island |
| 12. SIMPLE COFFERDAM WHARF PROJECT OF INDONESIA-CHINA INTEGRATED INDUSTRIAL PARK | Labor Supply | PT. China Harbour Indonesia | Ketapang Regency, West Kalimantan |
| 13. PROYEK PLTU GORONTALO, SULAWESI | Labor Supply | JO Shanghai Electric Power Construction Co., Ltd & PT. Bagus Karya | Gorontalo, Sulawesi |
| Project Name | Type | Client | Location |
|---|---|---|---|
| 1.BAYAH 10000 TPD CEMENT PLANT PROJECT PHASE 2 | Construction | PT. Sinoma Engineering Indonesia | Bayah, Lebak Regency, Banten |
| 2. SLOPE CONSTRUCTION AND DESALINATION PIPELINE PROJECT FOR ALUMINA REFINERY | Construction | PT. Well Harvest Winning Alumina Refinery | Ketapang Regency, West Kalimantan |
| 3. MEIKARTA CONSTRUCTION PROJECT | Construction | BUT China State Construction Engineering Co. Ltd | Cikarang, Bekasi |
| 4. JAVA-7 2*100MW COAL-FIRED STEAM POWER PLANT PROJECT | Construction | PT. China Harbour Indonesia | Serang, Banten |
| 5. JORR HIGHWAY KUNCIRAN-PARIGI PROJECT I & II Scope of work(s): Constructing auxiliary workshop outside the main plant |
Construction | SINOHYDRO | Bengkulu, South West Sumatera |
| 6. PLTMG JAYAPURA, PAPUA PROJECT | Labor Supply | KSO Bagus Karya Aecom Cogindo | Jayapura Regency, Papua |
| 7. PLTMG BAUBAU, SULAWESI TENGGARA PROJECT | Labor Supply | KSO Bagus Karya Aecom Cogindo | Baubau, Southwest Sulawesi |
| 8. PLTMG AMBON, MALUKU PROJECT | Labor Supply | KSO Bagus Karya Aecom Cogindo | Ambon, Maluku |
| 9. INSTALLATION PROJECT (B LOTTERY) BENGKULU (2X100MW) COAL-FIRED POWER GENERATION PROJECT IN INDONESIA | Labor Supply | PT. Nantong | Bengkulu, Sumatera |
| 10. MARINE JETTY ENGINEERING PROJECT KETAPANG | Labor Supply | PT. China Harbour Indonesia | Ketapang Regency, West Kalimantan |
| 11. PROYEK PEMBANGUNAN PABRIK TIMAH BANGKA BELITUNG | Labor Supply | BUT Sinoma (Tianjin) Construction Co., Ltd | Bangka Belitung island |
| 12. SIMPLE COFFERDAM WHARF PROJECT OF INDONESIA-CHINA INTEGRATED INDUSTRIAL PARK | Labor Supply | PT. China Harbour Indonesia | Ketapang Regency, West Kalimantan |
| 13. PROYEK PLTU GORONTALO, SULAWESI | Labor Supply | JO Shanghai Electric Power Construction Co., Ltd & PT. Bagus Karya | Gorontalo, Sulawesi |
| Project Name | Type | Client | Location | Value |
|---|---|---|---|---|
| BATURAJA CEMENT PROJECT ground,level off the spoil ground | Construction | BUT Sinoma (Tianjin) Construction | Baturaja, Ogan Komering Ulur, West Sumatera | IDR 3.059.328.800,00 |
| MARUNDA CENTER TERMINAL PROJECT PHASE 18 Scope of work(s): Concrete casting and construction & installation of the entrance road |
Construction | PT. China Harbour Indonesia | Bekasi, West Java | IDR 4.027.482.530,00 |
| CIVIL WORK FOR ALUMINA REFINERY Scope of work(s): Demolition of coal in the open coal field and dry coal warehouse of the PT WHW power plant, is converted into slopes |
Construction | PT. Well Harvest Winning Alumina Refinery | Ketapang Regency, West Kalimantan | IDR 75.000.000,00 |
| INSTALLATION OF SALT REMOVERING WATER CHANNEL FOR ALUMINA REFINERY PROJECT Scope of work(s): Installation of bracket shell heat excanger pipe and support, also additional demineral water pipes |
Construction | PT. Well Harvest Winning Alumina Refinery | Ketapang Regency, West Kalimantan | IDR 1.000.000.000,00 |
| OKI PULP AND PAPER MILL PLANT PROJECT Scope of work(s): OKI MILL electrical installation and other project work #5-PULP drying machine |
Construction | PT. Northeast Electric Power Construction | Ogan Komering Ilir Regency, South Sumatera | IDR 18.709.950.996,00 |
| KALTENG-1 COAL FIRED STEAM POWER PLANT 2x100MW PROJECT Scope of work(s): Undertake the construction work of temporary living and working buildings for KALTENG-1 COAL FIRED STEAM POWER PLANT 2x100MW PROJECT |
Construction | Hubei Second Electric Power Construction Engineering Company | Tumbang Kajui Village, Rungan sub district, Gunung mas regency, Centrak Kalimantan | IDR 16.180.383.529,00 |
| OKI PULP AND PAPER MILL PLANT PROJECT Scope of work(s): Supply for mechanical. Electrical and instrumentation installation work |
Material and Instrumentation Supply | PT. Northeast Electric Power Construction | Ogan Komering Ilir Regency, South Sumatera | IDR 8.385.991.144,00 |
| TAKALAR 1*100 MW PROJECT Scope of work(s): Labor Supply |
Labor Supply | PT. Mutiara Indah Construction | Takalar Regency, South Sulawesi | IDR 1.286.695.405,00 |
| JENEPONTO EXPANSION 2X135 MW CFSPP PROJECT Scope of work(s): Labor Supply |
Labor Supply | PT. D&C Engineering Company | Jeneponto Regency, South Sulawesi | IDR 11.254.311.480,00 |
| MARUNDA CENTER TERMINAL Project Phase I Scope of work(s): Labor Supply |
Labor Supply | PT. China Harbour Indonesia | Bekasi, West Java | IDR 10.434.257.944,00 |
| WULING FACTORY PROJECT Scope of work(s): Labor Supply |
Labor Supply | Metallurgical corporation of China Ltd | Bekasi, West Java | IDR 5.514.157.259 |
| BATURAJA CEMENT PROJECT Scope of work(s): Labor Supply |
Labor Supply | BUT Sinoma (Tianjin) Construction Co., Ltd | Baturaja, Ogan Komering Ulu, South Sumatera | IDR 9.596.360.863,00 |
| PLTU 2 X 25 MW MAMUJU PROJECT Scope of work(s): Labor Supply |
Labor Supply | BUT Sinoma (Tianjin) Construction Co., Ltd | Mamuju Regency, South Sulawesi | IDR 3.019.816.796,00 |
| SUMSEL-1 (2X150MW) PROJECT KEC. BAYUNG LENCIR, PALEMBANG Scope of work(s): Labor Supply |
Labor Supply | Northeast Electric Power Construction Co., Ltd | Bayung lencir, Palembang, South Sumatera | IDR 3.704.741.701,00 |
| Project Name | Type | Client | Location | Value |
|---|---|---|---|---|
| PLTU SUMSEL 5 2x150MW PROJECT Scope of work(s): This Project is working for whole project, include civil work, installation, commisioning, etc |
Construction | BUT Harbin Power System Engineering and Research Institute Co., Ltd | Bayung Lencir, Kabupaten Musi Banyuasin, South Sumatera | IDR 18.822.286.764,00 |
| CONSTRUCTION OF LIVING AREA, OFFICE AREA, SUPPORTING FACILUTIES FOR INDONESIA ALUMINA PROJECT PHASE I Scope of work(s): This Project is working on installing belt conveyor system and other supporting works. At the same time working on installing the steel structure and HVAC in the construction area of the jetty. |
Construction | PT. China Harbour Indonesia | Ketapang Regency, West Kalimantan | IDR 20.549.325.000,00 |
| PLTU BELAWAN PROJECT Scope of work(s): Labor Supply |
Labor Supply | PT. Wyser Construction Indonesia | Medan, North Sumatera | IDR 6.333.047.633,00 |
| PLTU BELAWAN PROJECT Scope of work(s): Labor Supply |
Labor Supply | PT. Shanghai Electric Power Construction | Medan, North Sumatera | IDR 50.858.015.697,00 |
| PLTU SUMSEL 5 2x150MW PROJECT Scope of work(s): Working for whole site maintenance |
Maintenance | BUT Harbin Power System Engineering and Research Institute Co., Ltd | Bayung Lencir, Kabupaten Musi Banyuasin, South Sumatera | IDR 310.000.000,00 |
| PLTU BANJARSARI 2X135 MW COAL-FIRED POWER PLANT Scope of work(s): Repair all broken part of the slope works in all plant area, including access road, north and west part close to the Fence according to main contract requirement, at the same time keep the potential broken part in good condition to avoid collapse during rain season. |
Construction | BUT China National Electric Equipment Corporation (CNEEC) | Lahat Regency, South Sumatera | IDR 1.600.000.000,00 |
| PLTU SUMSEL 5 2x150MW PROJECT Scope of work(s): Working for coal feeder emergency maintenance |
Maintenance | BUT Harbin Power System Engineering and Research Institute Co., Ltd | Bayung Lencir, Kabupaten Musi Banyuasin, South Sumatera | IDR 330.000.440,00 |
| PLTU SUMSEL 5 2x150MW PROJECT Scope of work(s): Supply stone with qty 4.369m3 |
Material Supply | BUT Harbin Power System Engineering and Research Institute Co., Ltd | Bayung Lencir, Kabupaten Musi Banyuasin, South Sumatera | IDR 2.378.920.500,00 |
| Project Name | Type | Client | Location | Value |
|---|---|---|---|---|
| CONSTRUCTION OF LIVING AREA, OFFICE AREA, SUPPORTING FACILUTIES FOR INDONESIA ALUMINA PROJECT PHASE I Scope of work(s): Installing scaffolding for the construction of living area, office and supporting facilties on the ongoing project |
Construction | BUT China State Construction Engineering Co. Ltd | Ketapang Regency, West Kalimantan | IDR 16.800.000.000,00 |
| TAKALAR 1*100 MW PROJECT Scope of work(s): One 10.000dwt berth for coal unloading jetty, its auxiliary facilities and water intake and drainage facilities, etc |
Construction | CGGC-HK Consortium | Takalar Regency, South Sulawesi | IDR 7.160.000.000,00 |
| MARINE JETTY ENGINEERING PROJECT KETAPANG Scope of work(s): Complete all the construction of this engineering according to requirement of design drawings, including inspection and acceptance, prepare for construction manuals, inspection and acceptance documents, provide machinery (digging, trailer, crane, loader, earthmover, and so on), tools( water pump, welding machine, grooving machine, pipe connection equipment. water suction and so on) and assistance material. |
Construction | PT. China Harbour Indonesia | Ketapang Regency, West Kalimantan | IDR 96.962.250.000 |
| SUMSEL -5 (2X150 MW) Scope of work(s): The Offsite earthwork excavation, transportation , and backfill |
Construction | - | Musi Banyuasin | IDR 4.949.432.303 |
| TERMINAL 1A, MARUNDA CENTER PROJECT Scope of work(s): Mobilization and demobilization dredge equipment and working for dredging at the Terminal Site |
Construction | PT. China Harbour Indonesia | Terminal 1A Marunda Center, Jakarta | IDR 4.922.033.600 |
| SUMSEL LAHAT 2 X 135 MW UNIT TEST OF ELECTRICAL EQUIPMENT IN COAL-FIRED POWER PLANT Scope of work(s): Test Communissioning |
Construction | Shanxi No 4 Electric Power Construction Company | Sumsel , Lahat | IDR 2.134.329.000,00 |
| COAL-FIRED POWER PLANT BALI 3 X 142MW Scope of work(s): Pipe installation |
Construction | BUT Shanghai Power Erection No. 2 Company | Celukan Bawang,Gerokgak, Singaraja | IDR 23.308.000.000,00 |
| PLTU 2 JATENG 1 X 660 MW ADIPALA , CILACAP Scope of work(s): Responsibility for the making and compilation of drawing and operation instruction for the work, construction work and daily maintenance at temporary cofferdam |
Construction | PT Northeast Electric Power Construction (PT NEPC) | Cilacap | IDR 5.600.000.000,00 |
| MARINE JETTY ENGINEERING OF PT WHW ALUMINA REFINERY PLASTIC DRAINAGE INSTALLATION Scope of work(s): Installation prefabricated vertical drain in the scope of Marine Jetty of PT WHW |
Construction | PT. China Harbour Indonesia | Ketapang, Kalimantan Barat | IDR 5.143.297.500 |
| KARANG TARAJE PORT PROJECT-TEMPORARY JETTY Scope of work(s): Rock transportation |
Procurement | PT. China Harbour Indonesia | Bayah, Lebak, Banten | IDR 3.500.000.000,00 |
| PLTU SULAWESI SELATAN 2 X 50 MW Scope of work(s): Labor Supply |
Labor Supply | Hubei Second Electric Power Construction Engineering Company | Barru Regency, South Sulawesi | IDR 61.262.275,00 |
| OKI PROJECT Scope of work(s): Labor Supply |
Labor Supply | Northeast Electric Power Construction Co., Ltd | Ogan Komering Ilir, South Sumatera | IDR 37.294.600.583,00 |
| MARINE JETTY ENGINEERING PROJECT KETAPANG Scope of work(s): Labor Supply |
Labor Supply | PT. China Harbour Indonesia | Ketapang Regency, West Kalimantan | IDR 15.282.824.558,00 |
| Project Name | Type | Client | Location | Value |
|---|---|---|---|---|
| PLTU BANJARSARI 2X135 MW COAL-FIRED POWER PLANT Scope of work(s): This Project is working on the installation of water intake pump house, river water treatment plant, comprehensive water pump house, sewage water treatment plant and other equipments installation, such as : Relevant piping installation, electrical, control instruments and panels/cabinets installation, cable laying and so on. |
Construction | BUT China National Electric Equipment Corporation | Lahat Regency, South Sumatera | IDR 8.968.799.393,40 |
| BAYAH 10000 TPD CEMENT PLANT PROJECT PHASE I Scope of work(s): This project is working on constructing dormitory for the labor supply to work on the project ongoing on work site, such as: Lighting, applying fire protection and supply & drainage works for jetty and road; Water, electricity, equipment installation for office building. |
Construction | PT. Sinoma Engineering Indonesia | Bayah, Lebak Regency, Banten | IDR 11.123.736.960,00 |
| CAUSEWAY PHASE 1A EPC PROJECT IN MARUNDA INDUSTRIAL & WAREHOUSE CENTER Scope of work(s): The works of this contract is the 240m access road construction |
Construction | PT. China Harbour Indonesia | Bekasi, West Java | IDR 1.485.000.000,00 |
| PLTU BANJARSARI 2X135 MW COAL-FIRED POWER PLANT Scope of work(s): Logistics Services |
Logistics Services | BUT China National Electric Equipment Corporation (CNEEC) | Lahat Regency, South Sumatera | IDR 1.659.584.568,00 |
| CAUSEWAY PHASE 1A EPC PROJECT IN MARUNDA INDUSTRIAL & WAREHOUSE CENTER Scope of work(s): The total quantity of concrete is around 10.709,58m3 in the work (the actual quantity will be measured on site and by the design drawing), including the 6214m3 transverse beam cast in situ, about 2979,79m3 surface & curb in situ, other 1515,79m3 concrete cast in situ works including girder, pile core and joint of hollow slab etc. Other works stated in this contract is the Pile Cutting & Splicing, Member Installation and other works |
Construction | PT. China Harbour Indonesia | Bekasi, West Java | IDR 6.467.380.000,00 |
| PLTU SURALAYA Scope of work(s): Labor Supply |
Labor Supply | PT. China Harbour Indonesia | Cilegon, Banten | IDR 3.660.000.000,00 |
| BAYAH 10,000 TPD CEMENT PLANT PROJECT PHASE I Scope of work(s): Labor Supply |
Labor Supply | PT. Sinoma Engineering Indonesia | Bayah, Lebak, Banten | IDR 2.610.783.000,00 |
| KARANG TARAJE PORT FOR BAYAH 10,000 TPD CEMENT PLANT PROJECT Scope of work(s): Labor Supply |
Labor Supply | PT. China Harbour Indonesia | Bayah, Lebak, Banten | IDR 2.596.860.000,00 |
| Project Name | Type | Client | Location | Value |
|---|---|---|---|---|
| PT PLN (PERSERO) PLTU 1 JATIM-PACITAN 2X315 MW COAL FIRED STEAM POWER PLANT PROJECT Scope of work(s): This project is working on the erection of process units in coal unloading platform & its access bridge, switchboard room, TT-0# transfer tower, approach bridge trestle, rail of coal unloader, etc., including but not limited to, electric, water supply & drainage, fire fighting, control, HVAC system, Communications, erection of belt conveyor & its auxiliary facilities and erection of rail of coal unloader. |
Construction | PT. Dongfang Electric Indonesia | Pacitan Regency, East Java | IDR 5.033.254.354,00 |
| PLTU BANJARSARI 2X135 MW COAL-FIRED POWER PLANT Scope of work(s): Rebar supply |
Material Supply | BUT China National Electric Equipment Coproration (CNEEC) | Lahat Regency, South Sumatera | IDR 1.434.694.043,00 |
| PLTU BANJARSARI 2X135 MW COAL-FIRED POWER PLANT Scope of work(s): Equipment for PLTU Banjarsari Project: Vacuum oil filter, Electric Beveling machine, Pipe Magneic Field Cutter, Xray Flaw Detector |
Equipment Supply | BUT China National Electric Equipment Coproration (CNEEC) | Lahat Regency, South Sumatera | IDR 1.383.360.000,00 |
| PLTU BANJARSARI 2X135 MW COAL-FIRED POWER PLANT Scope of work(s): Equipment for PLTU Banjarsari Project: Winch |
Equipment Supply | BUT China National Electric Equipment Corporation (CNEEC) | Lahat Regency, South Sumatera | IDR 2.261.614.256,00 |
| PLTU KEBAN AGUNG 2 X 135 MINE MOUTH COAL-FIRED STEAM POWER PLANT Scope of work(s): 2# furnace 25T with arm crane foundation production engineering construction contract (Indonesia KEBAN AGUNG 2X135MW Project 1#, 2# Unit) |
Labor Supply | Shanxi No. 4 Electric Power Construction Company | West Merapi, Lahat Regency, South Sumatera | IDR 284.941.000,00 |
| Project Name | Type | Client | Location | Value |
|---|---|---|---|---|
| INDONESIAN ADIPALA 1*660MW SUPERCRITICAL COAL-FIRED POWER STATION OFFSHORE ENGINEERING Scope of work(s): Purchase of "Movable Housing" |
Facility Supply | PT. China Harbour Indonesia | Adipala, Cilacap, Central Java | IDR 1.116.658.860,00 |