Work Experiences

Project Name Type Client Location Value
TOLL ROAD DEVELOPMENT OF CILEUNYI-SUMEDANG-DAWUAN PHASE Ⅲ

Scope of work(s): Rock Excavation as waste with slope treatment,disposal,compaction of spoil ground,level off the spoil ground
Construction China Road and Bridge Corporation & PT. Adhi Karya (Persero) Tbk Joint Operation Bandung city, West Java Province ,Indonesia IDR 3.635.000.000
TOLL ROAD DEVELOPMENT OF CILEUNYI-SUMEDANG-DAWUAN PHASE

Scope of work(s): Earthwork excavation with slope treatment,disposal,compaction of spoil ground and backfill
Construction China Road and Bridge Corporation & PT. Adhi Karya (Persero) Tbk Joint Operation Bandung city, West Java Province ,Indonesia IDR 3.200.000.000
Project Name Type Client Location Value
1. OKI PULP AND PAPER MILL SEAPORT FACILITIES PROJECT

Scope of work(s): Installing fire portection system for seaport facilities
Construction PT. China Harbour Indonesia Ogan Komering Ilir Regency, South Sumatera IDR 26.170.212.766,00
2. SUMSEL-8 2X660MW MINE-MOUTH COAL FIRED POWER PLANT

Scope of work(s): Constructing temporary living area and production area building
Construction PT. Zhejiang Tenaga Pembangunan Indonesia Muara Enim Regency, South Sumatera IDR 3.892.980.000,00
3. JAKARTA OFFICE BUILDING RENOVATION

Scope of work(s):Jakarta office building renovation.
This project consisted of 2 content, design content and construction & procurement content
Construction China Huadian Hongkong Company Limited Jakarta IDR 3.892.980.000,00
4. SUMSEL-8 2X660MW MINE-MOUTH COAL FIRED POWER PLANT

Scope of work(s):This project consisted of commission purchase, low voltage electric generator installation, electric generator installation for
construction works, 800 meters long Indonesian style panel wall construction, and other works (such as: Supermarket near residential area).
Construction China Huadian Hongkong Company Limited Muara Enim Regency, South Sumatera IDR 16.540.440.000,00
5. ALUMINA REFINERY CONSTRUCTION PROJECT KETAPANG YEAR 2019

Scope of work(s): This project consisted of dust collector (with corresponding pipeline and electrical) project;
Dust collector project (This project is to
increase the foundation of 6 alumina silo dust collectors at the wharf, which are located at 40m of 2 # and 3 # silos and 12m away
from the bucket); Spare belt conveyor, reinforced steel beam and electrical construction; PE (Polyethylene) pipes reconstruction;Helipad and related roads construction.
Construction PT. Well Harvest Winning Alumina Refinery Mekar Utama Village,Ketapang Regency, West Kalimantan IDR 8.220.091.784,00
6. SULBAGUT -1 2X50MW MINE-MOUTH COAL FIRED POWER PLANT

Scope of work(s): The project consisted of whole plant retaining wall, plant slope protection, drainage ditch (cutting ditch), road works.
Construction PT. Sinoma Engineering Indonesia North Gorontalo, Sulawesi IDR 8.792.430.196,00
7. INDONESIAN BAYAH 10.000 TPD CLICKER CEMENT PRODUCTION LINE II PROJECT Labor Supply PT. Sinoma Engineering Indonesia Bayah, Lebak, Banten
8. PHASE 2 OF THE MARINE JETTY ENGINEERING OF PT WELL HARVEST WINNING ALUMINA REFINERY Labor Supply PT. China Harbour Indonesia Ketapang, West Kalimantan
Project Name Type Client Location
1.MARINE JETTY ENGINEERING PROJECT KETAPANG Construction PT. China Harbour Indonesia Ketapang Regency, West Kalimantan
2. JINCHUAN, WP & RKA LATERITENICKEL Construction PT. Wanatiara Persada Maluku
3. SIMPLE COFFERDAM WHARF PROJECT OF INDONESIA-CHINA INTEGRATED INDUSTRIAL PARK (JINCHUAN PARK) PHASE I Construction PT. China Harbour Indonesia Ketapang Regency, West Kalimantan
4. ALUMINA REFINERY CONSTRUCTION PROJECT KETAPANG YEAR 2018
construction works, 800 meters long Indonesian style panel wall construction, and other works (such as: Supermarket near residential area).
Construction PT. Well Harvest Winning Alumina Refinery Mekar Utama Village, Ketapang Regency, West Kalimantan
5. BENGKULU 2*100MW COAL-FRED STEAM POWER PLANT PROJECT
Scope of work(s):
Constructing auxiliary workshop outside the main plant
Construction SINOHYDRO Bengkulu, South West Sumatera
6. PLTMG JAYAPURA, PAPUA PROJECT Labor Supply KSO Bagus Karya Aecom Cogindo Jayapura Regency, Papua
7. PLTMG BAUBAU, SULAWESI TENGGARA PROJECT Labor Supply KSO Bagus Karya Aecom Cogindo Baubau, Southwest Sulawesi
8. PLTMG AMBON, MALUKU PROJECT Labor Supply KSO Bagus Karya Aecom Cogindo Ambon, Maluku
9. INSTALLATION PROJECT (B LOTTERY) BENGKULU (2X100MW) COAL-FIRED POWER GENERATION PROJECT IN INDONESIA Labor Supply PT. Nantong Bengkulu, Sumatera
10. MARINE JETTY ENGINEERING PROJECT KETAPANG Labor Supply PT. China Harbour Indonesia Ketapang Regency, West Kalimantan
11. PROYEK PEMBANGUNAN PABRIK TIMAH BANGKA BELITUNG Labor Supply BUT Sinoma (Tianjin) Construction Co., Ltd Bangka Belitung island
12. SIMPLE COFFERDAM WHARF PROJECT OF INDONESIA-CHINA INTEGRATED INDUSTRIAL PARK Labor Supply PT. China Harbour Indonesia Ketapang Regency, West Kalimantan
13. PROYEK PLTU GORONTALO, SULAWESI Labor Supply JO Shanghai Electric Power Construction Co., Ltd & PT. Bagus Karya Gorontalo, Sulawesi
Project Name Type Client Location
1.BAYAH 10000 TPD CEMENT PLANT PROJECT PHASE 2 Construction PT. Sinoma Engineering Indonesia Bayah, Lebak Regency, Banten
2. SLOPE CONSTRUCTION AND DESALINATION PIPELINE PROJECT FOR ALUMINA REFINERY Construction PT. Well Harvest Winning Alumina Refinery Ketapang Regency, West Kalimantan
3. MEIKARTA CONSTRUCTION PROJECT Construction BUT China State Construction Engineering Co. Ltd Cikarang, Bekasi
4. JAVA-7 2*100MW COAL-FIRED STEAM POWER PLANT PROJECT Construction PT. China Harbour Indonesia Serang, Banten
5. JORR HIGHWAY KUNCIRAN-PARIGI PROJECT I & II
Scope of work(s):
Constructing auxiliary workshop outside the main plant
Construction SINOHYDRO Bengkulu, South West Sumatera
6. PLTMG JAYAPURA, PAPUA PROJECT Labor Supply KSO Bagus Karya Aecom Cogindo Jayapura Regency, Papua
7. PLTMG BAUBAU, SULAWESI TENGGARA PROJECT Labor Supply KSO Bagus Karya Aecom Cogindo Baubau, Southwest Sulawesi
8. PLTMG AMBON, MALUKU PROJECT Labor Supply KSO Bagus Karya Aecom Cogindo Ambon, Maluku
9. INSTALLATION PROJECT (B LOTTERY) BENGKULU (2X100MW) COAL-FIRED POWER GENERATION PROJECT IN INDONESIA Labor Supply PT. Nantong Bengkulu, Sumatera
10. MARINE JETTY ENGINEERING PROJECT KETAPANG Labor Supply PT. China Harbour Indonesia Ketapang Regency, West Kalimantan
11. PROYEK PEMBANGUNAN PABRIK TIMAH BANGKA BELITUNG Labor Supply BUT Sinoma (Tianjin) Construction Co., Ltd Bangka Belitung island
12. SIMPLE COFFERDAM WHARF PROJECT OF INDONESIA-CHINA INTEGRATED INDUSTRIAL PARK Labor Supply PT. China Harbour Indonesia Ketapang Regency, West Kalimantan
13. PROYEK PLTU GORONTALO, SULAWESI Labor Supply JO Shanghai Electric Power Construction Co., Ltd & PT. Bagus Karya Gorontalo, Sulawesi
Project Name Type Client Location Value
BATURAJA CEMENT PROJECT ground,level off the spoil ground Construction BUT Sinoma (Tianjin) Construction Baturaja, Ogan Komering Ulur, West Sumatera IDR 3.059.328.800,00
MARUNDA CENTER TERMINAL PROJECT PHASE 18

Scope of work(s): Concrete casting and construction & installation of the entrance road
Construction PT. China Harbour Indonesia Bekasi, West Java IDR 4.027.482.530,00
CIVIL WORK FOR ALUMINA REFINERY

Scope of work(s): Demolition of coal in the open coal field and dry coal warehouse of the PT WHW power plant, is converted into slopes
Construction PT. Well Harvest Winning Alumina Refinery Ketapang Regency, West Kalimantan IDR 75.000.000,00
INSTALLATION OF SALT REMOVERING WATER CHANNEL FOR ALUMINA REFINERY PROJECT

Scope of work(s): Installation of bracket shell heat excanger pipe and support, also additional demineral water pipes
Construction PT. Well Harvest Winning Alumina Refinery Ketapang Regency, West Kalimantan IDR 1.000.000.000,00
OKI PULP AND PAPER MILL PLANT PROJECT

Scope of work(s): OKI MILL electrical installation and other project work #5-PULP drying machine
Construction PT. Northeast Electric Power Construction Ogan Komering Ilir Regency, South Sumatera IDR 18.709.950.996,00
KALTENG-1 COAL FIRED STEAM POWER PLANT 2x100MW PROJECT

Scope of work(s): Undertake the construction work of temporary living and working buildings for KALTENG-1 COAL FIRED STEAM POWER PLANT 2x100MW PROJECT
Construction Hubei Second Electric Power Construction Engineering Company Tumbang Kajui Village, Rungan sub district, Gunung mas regency, Centrak Kalimantan IDR 16.180.383.529,00
OKI PULP AND PAPER MILL PLANT PROJECT

Scope of work(s): Supply for mechanical. Electrical and instrumentation installation work
Material and Instrumentation Supply PT. Northeast Electric Power Construction Ogan Komering Ilir Regency, South Sumatera IDR 8.385.991.144,00
TAKALAR 1*100 MW PROJECT

Scope of work(s): Labor Supply
Labor Supply PT. Mutiara Indah Construction Takalar Regency, South Sulawesi IDR 1.286.695.405,00
JENEPONTO EXPANSION 2X135 MW CFSPP PROJECT

Scope of work(s): Labor Supply
Labor Supply PT. D&C Engineering Company Jeneponto Regency, South Sulawesi IDR 11.254.311.480,00
MARUNDA CENTER TERMINAL Project Phase I

Scope of work(s): Labor Supply
Labor Supply PT. China Harbour Indonesia Bekasi, West Java IDR 10.434.257.944,00
WULING FACTORY PROJECT

Scope of work(s): Labor Supply
Labor Supply Metallurgical corporation of China Ltd Bekasi, West Java IDR 5.514.157.259
BATURAJA CEMENT PROJECT

Scope of work(s): Labor Supply
Labor Supply BUT Sinoma (Tianjin) Construction Co., Ltd Baturaja, Ogan Komering Ulu, South Sumatera IDR 9.596.360.863,00
PLTU 2 X 25 MW MAMUJU PROJECT

Scope of work(s): Labor Supply
Labor Supply BUT Sinoma (Tianjin) Construction Co., Ltd Mamuju Regency, South Sulawesi IDR 3.019.816.796,00
SUMSEL-1 (2X150MW) PROJECT KEC. BAYUNG LENCIR, PALEMBANG

Scope of work(s): Labor Supply
Labor Supply Northeast Electric Power Construction Co., Ltd Bayung lencir, Palembang, South Sumatera IDR 3.704.741.701,00
Project Name Type Client Location Value
PLTU SUMSEL 5 2x150MW PROJECT

Scope of work(s): This Project is working for whole project, include civil work, installation, commisioning, etc
Construction BUT Harbin Power System Engineering and Research Institute Co., Ltd Bayung Lencir, Kabupaten Musi Banyuasin, South Sumatera IDR 18.822.286.764,00
CONSTRUCTION OF LIVING AREA, OFFICE AREA, SUPPORTING FACILUTIES FOR INDONESIA ALUMINA PROJECT PHASE I

Scope of work(s): This Project is working on installing belt conveyor system and other supporting works. At the same time working on installing the steel structure and HVAC in the construction area of the jetty.
Construction PT. China Harbour Indonesia Ketapang Regency, West Kalimantan IDR 20.549.325.000,00
PLTU BELAWAN PROJECT

Scope of work(s): Labor Supply
Labor Supply PT. Wyser Construction Indonesia Medan, North Sumatera IDR 6.333.047.633,00
PLTU BELAWAN PROJECT

Scope of work(s): Labor Supply
Labor Supply PT. Shanghai Electric Power Construction Medan, North Sumatera IDR 50.858.015.697,00
PLTU SUMSEL 5 2x150MW PROJECT

Scope of work(s): Working for whole site maintenance
Maintenance BUT Harbin Power System Engineering and Research Institute Co., Ltd Bayung Lencir, Kabupaten Musi Banyuasin, South Sumatera IDR 310.000.000,00
PLTU BANJARSARI 2X135 MW COAL-FIRED POWER PLANT

Scope of work(s): Repair all broken part of the slope works in all plant area, including access road, north and west part close to the Fence according to main contract requirement, at the same time keep the potential broken part in good condition to avoid collapse during rain season.
Construction BUT China National Electric Equipment Corporation (CNEEC) Lahat Regency, South Sumatera IDR 1.600.000.000,00
PLTU SUMSEL 5 2x150MW PROJECT

Scope of work(s): Working for coal feeder emergency maintenance
Maintenance BUT Harbin Power System Engineering and Research Institute Co., Ltd Bayung Lencir, Kabupaten Musi Banyuasin, South Sumatera IDR 330.000.440,00
PLTU SUMSEL 5 2x150MW PROJECT

Scope of work(s): Supply stone with qty 4.369m3
Material Supply BUT Harbin Power System Engineering and Research Institute Co., Ltd Bayung Lencir, Kabupaten Musi Banyuasin, South Sumatera IDR 2.378.920.500,00
Project Name Type Client Location Value
CONSTRUCTION OF LIVING AREA, OFFICE AREA, SUPPORTING FACILUTIES FOR INDONESIA ALUMINA PROJECT PHASE I

Scope of work(s): Installing scaffolding for the construction of living area, office and supporting facilties on the ongoing project
Construction BUT China State Construction Engineering Co. Ltd Ketapang Regency, West Kalimantan IDR 16.800.000.000,00
TAKALAR 1*100 MW PROJECT

Scope of work(s): One 10.000dwt berth for coal unloading jetty, its auxiliary facilities and water intake and drainage facilities, etc
Construction CGGC-HK Consortium Takalar Regency, South Sulawesi IDR 7.160.000.000,00
MARINE JETTY ENGINEERING PROJECT KETAPANG

Scope of work(s): Complete all the construction of this engineering according to requirement of design drawings, including inspection and acceptance, prepare for construction manuals, inspection and acceptance documents, provide machinery (digging, trailer, crane, loader, earthmover, and so on), tools( water pump, welding machine, grooving machine, pipe connection equipment. water suction and so on) and assistance material.
Construction PT. China Harbour Indonesia Ketapang Regency, West Kalimantan IDR 96.962.250.000
SUMSEL -5 (2X150 MW)

Scope of work(s): The Offsite earthwork excavation, transportation , and backfill
Construction - Musi Banyuasin IDR 4.949.432.303
TERMINAL 1A, MARUNDA CENTER PROJECT

Scope of work(s): Mobilization and demobilization dredge equipment and working for dredging at the Terminal Site
Construction PT. China Harbour Indonesia Terminal 1A Marunda Center, Jakarta IDR 4.922.033.600
SUMSEL LAHAT 2 X 135 MW UNIT TEST OF ELECTRICAL EQUIPMENT IN COAL-FIRED POWER PLANT

Scope of work(s): Test Communissioning
Construction Shanxi No 4 Electric Power Construction Company Sumsel , Lahat IDR 2.134.329.000,00
COAL-FIRED POWER PLANT BALI 3 X 142MW

Scope of work(s): Pipe installation
Construction BUT Shanghai Power Erection No. 2 Company Celukan Bawang,Gerokgak, Singaraja IDR 23.308.000.000,00
PLTU 2 JATENG 1 X 660 MW ADIPALA , CILACAP

Scope of work(s): Responsibility for the making and compilation of drawing and operation instruction for the work, construction work and daily maintenance at temporary cofferdam
Construction PT Northeast Electric Power Construction (PT NEPC) Cilacap IDR 5.600.000.000,00
MARINE JETTY ENGINEERING OF PT WHW ALUMINA REFINERY PLASTIC DRAINAGE INSTALLATION

Scope of work(s): Installation prefabricated vertical drain in the scope of Marine Jetty of PT WHW
Construction PT. China Harbour Indonesia Ketapang, Kalimantan Barat IDR 5.143.297.500
KARANG TARAJE PORT PROJECT-TEMPORARY JETTY

Scope of work(s): Rock transportation
Procurement PT. China Harbour Indonesia Bayah, Lebak, Banten IDR 3.500.000.000,00
PLTU SULAWESI SELATAN 2 X 50 MW

Scope of work(s): Labor Supply
Labor Supply Hubei Second Electric Power Construction Engineering Company Barru Regency, South Sulawesi IDR 61.262.275,00
OKI PROJECT

Scope of work(s): Labor Supply
Labor Supply Northeast Electric Power Construction Co., Ltd Ogan Komering Ilir, South Sumatera IDR 37.294.600.583,00
MARINE JETTY ENGINEERING PROJECT KETAPANG

Scope of work(s): Labor Supply
Labor Supply PT. China Harbour Indonesia Ketapang Regency, West Kalimantan IDR 15.282.824.558,00
Project Name Type Client Location Value
PLTU BANJARSARI 2X135 MW COAL-FIRED POWER PLANT

Scope of work(s): This Project is working on the installation of water intake pump house, river water treatment plant, comprehensive water pump house, sewage water treatment plant and other equipments installation, such as : Relevant piping installation, electrical, control instruments and panels/cabinets installation, cable laying and so on.
Construction BUT China National Electric Equipment Corporation Lahat Regency, South Sumatera IDR 8.968.799.393,40
BAYAH 10000 TPD CEMENT PLANT PROJECT PHASE I

Scope of work(s): This project is working on constructing dormitory for the labor supply to work on the project ongoing on work site, such as: Lighting, applying fire protection and supply & drainage works for jetty and road; Water, electricity, equipment installation for office building.
Construction PT. Sinoma Engineering Indonesia Bayah, Lebak Regency, Banten IDR 11.123.736.960,00
CAUSEWAY PHASE 1A EPC PROJECT IN MARUNDA INDUSTRIAL & WAREHOUSE CENTER

Scope of work(s): The works of this contract is the 240m access road construction
Construction PT. China Harbour Indonesia Bekasi, West Java IDR 1.485.000.000,00
PLTU BANJARSARI 2X135 MW COAL-FIRED POWER PLANT

Scope of work(s): Logistics Services
Logistics Services BUT China National Electric Equipment Corporation (CNEEC) Lahat Regency, South Sumatera IDR 1.659.584.568,00
CAUSEWAY PHASE 1A EPC PROJECT IN MARUNDA INDUSTRIAL & WAREHOUSE CENTER

Scope of work(s): The total quantity of concrete is around 10.709,58m3 in the work (the actual quantity will be measured on site and by the design drawing), including the 6214m3 transverse beam cast in situ, about 2979,79m3 surface & curb in situ, other 1515,79m3 concrete cast in situ works including girder, pile core and joint of hollow slab etc. Other works stated in this contract is the Pile Cutting & Splicing, Member Installation and other works
Construction PT. China Harbour Indonesia Bekasi, West Java IDR 6.467.380.000,00
PLTU SURALAYA

Scope of work(s): Labor Supply
Labor Supply PT. China Harbour Indonesia Cilegon, Banten IDR 3.660.000.000,00
BAYAH 10,000 TPD CEMENT PLANT PROJECT PHASE I

Scope of work(s): Labor Supply
Labor Supply PT. Sinoma Engineering Indonesia Bayah, Lebak, Banten IDR 2.610.783.000,00
KARANG TARAJE PORT FOR BAYAH 10,000 TPD CEMENT PLANT PROJECT

Scope of work(s): Labor Supply
Labor Supply PT. China Harbour Indonesia Bayah, Lebak, Banten IDR 2.596.860.000,00
Project Name Type Client Location Value
PT PLN (PERSERO) PLTU 1 JATIM-PACITAN 2X315 MW COAL FIRED STEAM POWER PLANT PROJECT

Scope of work(s): This project is working on the erection of process units in coal unloading platform & its access bridge, switchboard room, TT-0# transfer tower, approach bridge trestle, rail of coal unloader, etc., including but not limited to, electric, water supply & drainage, fire fighting, control, HVAC system, Communications, erection of belt conveyor & its auxiliary facilities and erection of rail of coal unloader.
Construction PT. Dongfang Electric Indonesia Pacitan Regency, East Java IDR 5.033.254.354,00
PLTU BANJARSARI 2X135 MW COAL-FIRED POWER PLANT

Scope of work(s): Rebar supply
Material Supply BUT China National Electric Equipment Coproration (CNEEC) Lahat Regency, South Sumatera IDR 1.434.694.043,00
PLTU BANJARSARI 2X135 MW COAL-FIRED POWER PLANT

Scope of work(s): Equipment for PLTU Banjarsari Project: Vacuum oil filter, Electric Beveling machine, Pipe Magneic Field Cutter, Xray Flaw Detector
Equipment Supply BUT China National Electric Equipment Coproration (CNEEC) Lahat Regency, South Sumatera IDR 1.383.360.000,00
PLTU BANJARSARI 2X135 MW COAL-FIRED POWER PLANT

Scope of work(s): Equipment for PLTU Banjarsari Project: Winch
Equipment Supply BUT China National Electric Equipment Corporation (CNEEC) Lahat Regency, South Sumatera IDR 2.261.614.256,00
PLTU KEBAN AGUNG 2 X 135 MINE MOUTH COAL-FIRED STEAM POWER PLANT

Scope of work(s): 2# furnace 25T with arm crane foundation production engineering construction contract (Indonesia KEBAN AGUNG 2X135MW Project 1#, 2# Unit)
Labor Supply Shanxi No. 4 Electric Power Construction Company West Merapi, Lahat Regency, South Sumatera IDR 284.941.000,00
Project Name Type Client Location Value
INDONESIAN ADIPALA 1*660MW SUPERCRITICAL COAL-FIRED POWER STATION OFFSHORE ENGINEERING

Scope of work(s): Purchase of "Movable Housing"
Facility Supply PT. China Harbour Indonesia Adipala, Cilacap, Central Java IDR 1.116.658.860,00